Stage 1: What decision are you actually trying to make?

CONTROLSPAN RESEARCH DESKSECTION 02 · PAGE 5 OF 20Last updated 28 October 2026

Write a two-page decision charter before inviting demonstrations. The purpose is to distinguish a software problem from a process, data or staffing problem.

What should the charter contain?

Use these fields:

  • Trigger: examination finding, control deficiency, renewal, acquisition, reporting requirement or operational bottleneck.
  • Current failure: a specific activity that does not work adequately.
  • Affected population: entities, functions, users and records.
  • First outcome: what should be demonstrably different after release one.
  • Decision deadline: including the reason it is fixed.
  • Alternatives: retain, repair, configure, buy or build.
  • Sponsor and decision rights: who resolves conflicting requirements.
  • Funding boundary: selection, delivery and ongoing operation.
  • Exclusions: work explicitly outside the first release.
  • Success evidence: the report, transaction or completed process that will prove usefulness.

A good first outcome is specific: A control owner can submit evidence, a reviewer can challenge it, a failed test creates an accountable action, and the committee report traces back to those records.

An insufficient outcome is: Create a single source of truth.

How do you establish a baseline?

Measure the existing workflow before changing it. Suggested measures include:

  • Time spent requesting and chasing evidence.
  • Elapsed time from submission to review.
  • Records without an accountable owner.
  • Actions overdue under the current policy.
  • Time required to reproduce the committee report.
  • Requests that need manual reconciliation between systems.
  • Costs of retained tools and external support.

Define the denominator and observation period. Separate labour capacity from avoidable expenditure: a reduction in task time is not a payroll saving unless finance identifies an actual cash consequence.

Exit gate: the sponsor can explain the problem, the first outcome, the alternatives and the person responsible for operating the result.